top of page

Our Services 

MCFA (Master Control Fire Alarm)

Equipment used to control, monitor, detect a fire in a building area that has been installed detecting devices whether it is fire, heat or smoke, this tool is usually located in engineering control room. Treatment is done regularly according to schedule, to check all fire sensing equipment, so that the equipment is always ready and functioning properly. Fire alarm maintenance measures include: Master Control Fire Alarm (MCFA), Announciator, Head detector, smoke detector and paging system. All led / pilot lamps on the MCFA panel must be in working condition. All led / pilot indicator lights on announciator zone should be lit when inspected. Emergency lighting treatments include battery, lamp / led indicator and lighting.

 

 

 

Electricity (lighting, panel, travo)

Electrical system throughout the activities / activities undertaken in our building. Maintenance of electrical equipment from upstream to downstream: transformer, HVDP panel, LVMDP panel, distribution panel, sub-sub panel, the following equipment including cleaning and lighting and stop contact.

 

 

Ventilating, Chiller AHU, Air Conditioning

The treatment is carried out so that the air system units in the building / building, still functioning properly and produce air that: clean, fresh, ideal and comfortable. Treatment is carried out periodically, including condenser cleaning, evaporator, physical unit, fan belt examination, ampere inspection, suction and discharge, while FCU treatment is done every 3 months.

Pumps (Pumps)

All pumping systems (pump machines) used in multi-storey buildings should be treated periodically so that the lifespan can be long and can function properly if used. Activities and activities undertaken in the care of the pumps, in order for the pump to work with capacity according to technical specifications, including the maintenance of the driving motors. Delivery pump treatment, distribution pumps, booster pumps, are carried out periodically.

 

 

STP (Sewage Treatment Plan)

Is a wastewater treatment system that comes from wastewater dirty water (closet), waste water (bathing / washing), kitchen and laundry, in order to obtain waste water quality standards that do not damage the environment (this water can be used as water watering the garden) carried out in the sewage treatment unit (Sewage Treatment Plan, Sump Pit, and Grease Trap) is intended to maintain and maintain the quality of waste water continuously in accordance with the standard of waste water quality established by the Department of Health. Examination of equipment units include: Clorination, Blower, Communitor, reducer speed disk, Disk, Pump-sump pit, Sluge Tank, Deffuser.

 

ELEVATOR/ESCALATOR

Tools that work to lighten, accelerate the transfer of goods or people. The care done by Building Engineering is useful to keep vertical transport units functioning properly, safely and always ready to function properly.

OTHERS

Other engineering problems in your property, please contact us...

bottom of page